New homes New homes · ADUs · Remodeling
More room for what comes next.
Castle Construction and Development builds new homes and ADUs, and remodels existing homes, across the Inland Empire. See what is possible for your property and start with a clear plan.
Not sure yet?
Chapter 1 of 3: Your property

Illustrative questions for a first site visit. Not measurements, and not a decision about what can be built.
Start with what the lot allows. Before anything is drawn, look at the site: its size, setbacks, slope, utilities and anything already built on it. See the process
Selected workFour featured projects
Built around real places.
Four featured projects with build cost, gross monthly rent and added value where Castle supplied a figure.



Exterior: AI landscaping concept, not built. Interiors: property photos. See all 28 photos
PROJECT 01 / 04
8961 Cypress Ave
Fontana · 4 bed · 2 bath · 1,200 sq ft
Ground-up ADU
Project figures
- Build cost
- $234,0001,200 sq ft × $195/sq ft
- Gross monthly rent
- $3,410/mo
- Added value
- $240,000–
$260,000
Castle-provided estimates. Gross rent is before expenses and vacancy; added value is not an appraisal.
Also in Fontana: 7384 Palmetto AveAll six projects
Before construction
Start with the site.
A good plan has to work on the actual property. Three things to settle first.
The property and access
Lot lines, what is already built, and how crews and materials reach the work area.
Utilities and site conditions
Where water, sewer, gas and power run, plus slope, soil and drainage.
The scope you want
What has to change, what can stay, and what still needs professional or city review.
Starting points for a conversation, not a determination of what can be approved.
What could your property become?
New homes
Remodeling & additions
ADUs Illustrative concept. Not Castle projects.

About Castle
Built on trust. Run by family.
Castle Construction & Development grew from a simple concern: homeowners deserve to know who is responsible for their project.
Co-founders
- Alejandro “Alika” Castellon Jr.
- Alex Castellon
See how your project takes shape
Choose a type of project. Each one keeps the same view from start to finish, so you can see what changes and what stays.
An empty site becomes a finished home, seen from the street.

Foundation
- What happens
- The site is prepared and the slab is poured.
- What you decide
- Final placement of the house on the lot.
- What must be checked
- Soil, grading and the foundation inspection.
Plan this project
Pick a project type and a few details. You will see what the work usually involves and what can change its cost.
Project scope summary
No price shownNew home · about 1,800 sq ft
No planning range is shown for new homes: published builder pricing varies too much with the lot, the design and the utilities to give a useful online figure. A property-specific review is how you get numbers for your lot.
Usually part of this scope
- Site review, survey and soils
- Design and engineering
- Foundation, framing and roof
- Plumbing, electrical and mechanical systems
- Utility connections and final inspection
What can change the cost
- Size: more square feet means more materials and labor.
- Standard finishes balance cost and quality; your selections still move the number.
- Your city: plan check, permit fees and local rules vary by city.
- Lot conditions: slope, soils and grading.
- Whether an existing house must be removed first.
- How far new utility connections have to run.
General planning information, not a quote. It does not confirm that a property qualifies for an ADU or what a city will approve, and it does not set permit fees or a timeline.
Ways homeowners may fund a project
Castle is not a lender and does not arrange financing. Compare total borrowing cost and repayment terms with a lender before choosing.
- Cash or savingsPay without a loan; keep funds available for project changes and other needs.
- Home equity loan or HELOCUses your home as collateral. A HELOC often has a variable rate, so payments can change.Source: CFPB
- Construction loanA lender may offer short-term financing for building or rehabilitating a home. Ask how funds are released and how the loan is repaid.Source: CFPB
Financing approval, rates and terms come from the lender, not Castle.
Get a property-specific review
What shapes the scope?
Four things do most of the work in deciding how big a project is. Open each to see what to think about before anyone prices it.
Existing property and site
What is already there sets the starting point: the lot’s size and slope, existing structures and their condition, and where water, sewer, gas and power come in.
Questions worth answering
- Do you have a survey or old plans?
- Where do utilities enter the property?
- Is anything on the lot in poor condition?
What it can change: Site preparation, what can be reused, and how far new connections need to run.
For this project type (All project types): Start by noting what is already on the property.
Nobody can price a project from a web page. These are the questions that make a first conversation useful.
Start prepared
A checklist you can use on your own. Nothing here asks for your contact details.
0 / 6 ready
Your ticks are saved in this browser only.
Common questions
Short answers, grouped by project type. Specific rules depend on your property and your city.
Zoning and setbacks, whether utilities reach the lot, soil and slope, and access for construction. A site review before you commit is worth more than any early design.
It looks at the lot before anything is designed: zoning and setbacks, where utilities are, soil and slope, access for construction, and anything recorded on the property. The result is a short list of conditions to confirm with the city and any specialists.
It depends on the condition of the existing house, what the city allows, and what you need. Comparing both for the same property is the only honest way to decide.
An addition enlarges your existing home and stays part of one dwelling. An attached ADU is a separate unit with its own entrance, kitchen and bathroom, reviewed under ADU rules.
Often yes, with planning around noise, dust, utilities and access. Some stages, such as work on kitchens or main systems, may make it harder.
Work that changes the structure, plumbing, electrical or mechanical systems usually does; purely cosmetic work often does not. Your city decides, so confirm before work starts.
Through a new foundation beside the house, framing that ties into the existing walls and roof, and weatherproofing where old meets new. How the roofs meet and whether the floor levels match are decided early in design.
Yard space, setbacks, existing structures and utility routes usually narrow it down. A garage conversion reuses a structure; a detached unit needs yard space; an attached unit shares a wall with the house.
Yes. You can rent an ADU separately from the house, and the city cannot require you to live on the property; it may prohibit rentals shorter than 30 days. A junior ADU is different: if it shares a bathroom with the house, the owner must live in either the main residence or the junior ADU, and it may only be rented for more than 30 days. Other local rules still apply, so confirm with your city. (California Government Code §66314(d)(1), §66315, §66333(b) and (g))
A small unit inside the house: no larger than 500 square feet of interior living space, contained entirely within a single-family home. It may have its own bathroom or share one with the house. (California Government Code §66313(d))
No. The city cannot require you to replace the parking lost when a garage is converted to an ADU. Your city’s other requirements still apply, so confirm them before you plan. (California Government Code §66314(d)(11))
The permitting agency has 15 business days to tell you whether your application is complete, then 60 days to approve or deny a complete application when a house already exists on the lot. Details and sources on the ADU page
Only a newly built detached ADU needs new solar panels; attached ADUs and garage conversions do not. Details and sources on the ADU page
Not if the ADU is 750 square feet or less (500 for a junior ADU). Other fees, such as permit, school and utility connection fees, can still apply. Details and sources on the ADU page
With the city or county where the property is; each has its own ADU ordinance and submittal process. Details and sources on the ADU page
Not exactly from a web page. For remodels, additions and ADUs, the cost calculator on the homepage shows an early planning range based on published California builder pricing; it is not a quote. Cost depends on the site, the size, the design and finishes, so a realistic number for your project comes after the property has been reviewed and a concept exists.
Size, site conditions, how much of an existing structure changes, and finish level. The scope section on each service page explains each one.
Yes. Plans are reviewed and approved by the city before physical work begins, and inspections happen at stages during construction.
You talk through your goals, the property and your questions. Bringing the preparation checklist from the Resources page makes it more useful.
Further reading
- ADU types explainedGarage conversion, attached and detached units.
- Remodeling while you live at homeSequencing, protection and what to expect.
- Building on a vacant lotWhat to check before buying or designing.
- Addition or attached ADU?How the two routes differ, compared side by side.
- How a project comes togetherProperty, plan and build, step by step.
